Ongoing Projects

ROADS AND HIGHWAYS CONSTRUCTION

Four lanning of aligarh-kanpur section from km. 140.200 (design chainage 149.900) to km 186.000 (design chainage 195.733) [package-i from aligarh-bhadwas] of nh-91 in the state of uttar pradesh on hybrid annuity mode under bharatmala pariyojana.

Rehabilitation and up-gradation 4 lane to 6 lane of bhadrak – baleshwar section of nh-5 (new nh-16) from km. 136.500 to km. 199.141 in the state of odisha under nhdp phase-v (pkg.-ii) on hybrid annuity mode.

Rehabitation and upgradation of bareli to goharganj section of nh-12 from existing km 193.00 to km 255.300 through epc contract under nhdp – iii in the state of madhya pradesh.

Widening of existing single lane carriageway to two lane carriageway with paved shoulder and strengthening from km. 51.000 (50.675) to 105.00 of nh-730a in the state of uttar pradesh on epc mode.

Rship package-1:development and maintenance of kanwas – khanpur - aklera section of sh-74, deoli- kanwas section of sh-74 a, alot (mp) –gangdhar - suwansara (mp) section of sh-19 c and kherli-pahari section of sh-22 (total length:175.36 km) under design, build, operate/maintain and transfer on ppp (annuity) mode.

Development, operation and maintenance of the gadoj (state border) – majri to haryana / rajasthan border and majri to neemrana (sh-111 and sh-111-a) highway project (the “project”) through public private partnership (the “ppp”) on design, build, finance, operate and transfer (dbfot) basis , total length 46.40 km.

Improvement to harsool jatwada jaitkheda road sh-214 km 10/00 to 20/00, 22/00 to 23/00 and 37/00 to 46/00 tq. Khultabad dist. Aurangabad.

Construction Of Embankment By Cutting And Raising Of Existing Bank, Minor And Road Under Bridge From Km.0.00 To Km.12.0 Between Gudha & Thathana Mithri Stations Of Jodhpur Division In Connection With Test Track For Rdso - Railway Project Rob /Rub

Construction Of Embankment By Cutting And Raising Of Existing Bank, Minor And Road Under Bridges From Km.12.00 To Km.25.0 Between Gudha & Thathana Mithri Stations Of Jodhpur Division In Connection With Dedicated Test Track For Rdso - Railway Project Rob /Rub

HOUSING INFRASTRUCTURE

Construction of 1675 multistoreyed dwelling units for in situ rahabilitation of slum dwellers at jailerwala bagh, ashok vihar, new delhi.

URBAN INFRASTRUCTURE

Development of infrastructure facilities including electrificaton on turnkey basis at phase-ii, industrial estate barwala, distt. Panchkula.

Up-gradation of infrastructure i.e. Cement concrete road network, water supply system, waste water conveyance system, re-circulation system of treated waste water, storm water drainage system, development of water works, street lighting and all other works contingent thereto, including trial run for 3 months and thereafter defect liability for 60 months on turnkey basis in industrial sectors -24, 25, 32 (dlf) & nit, faridabad, under aside scheme.

Infrastructure Development Works Including Road, Sewerage, Drainage, Water Supply, Treated Water Network, Cable Trench And Allied Works At Model Economic Township Project (561 Acres), Jhajjar, Haryana

WATER MANAGEMENT

Augmentation work of water supply scheme of 3 villages of ambala sadar and replacement of pollution prone water pipe line in ambala city under amrut program.

Providing master storm water drainage scheme in left out balance portion for sector-75 to 89, faridabad. (including mtc. Of defect liability period of three year free of cost after completion of work)

Augmentation work of water supply scheme for 10 villages recently merged in mc limit and providing distribution systems in deprived areas of sonepat town under amrut program.

Construction of complete sewerage system of 5 nallahs by way olaying of sewers, construction of manhole incl: house connections etc on left bank of river tawi.

Augmentation & providing sewerage system in faridabad town part-b (construction of 1 mps, 4 ips and sewerage network with main connecting sewer) along with o&m for 5 years under amrut program.

Augmentation of water supply system in kaithal town including distribution system, automation of wtp, boosting stations and o&m for one year during defects liability period and five years thereafter under amrut program.